Concrete slab ground floorDescriptionWALLTITE is applied directly to the concrete. Under-floor heating pipes can be fixed to the foam with the normal clips. A layer of tamped or self-levelling screed is applied, usually to a depth of 75mm. The process is extremely quick to apply compared to other methods and the problems of insulation boards lifting are avoided. Site overhead time and material waste from off-cuts are minimised. CertificationBBA Certificate No. 11/4816. WALLTITE has undergone various performance tests. |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||